DESIGNETZ

Already today the German distribution network operator EWR Netz GmbH experiences high reverse power flows due to wind and solar power. Voltage and overload problems are the consequence. New innovative technologies and changes in the operation of the network have the potential to curb otherwise necessary grid reinforcements.

DESIGNETZ aims to test these new technologies on a wide scale and to find cost optimal solutions. Wide area voltage control, voltage regulators or reactive power control are possible remedies, supported by a large Smart Meter rollout. Energynautics analyses the different options and their respective impact, to guarantee an effective expansion of renewables and to infer general recommendations for the research project. A key aim is as well to put the BDEW traffic light concept into practice, in order to test the possibilities of a future flexibility market.

To learn more visit:

DESIGNETZ Website

Find news about the project here:

Project DESIGNETZ is in full swing (October 2017)

Client:
EWR Netz GmbH / Germany

Project Duration:
01/2017 – 12/2018